Deck Lifecycle
Menu

Ownership scenario planner

Compare two user-defined plans with a complete year-by-year ledger.

Preparing interactive controls…

All amounts are today's US dollars. Future events occur at year-end; initial cost occurs now. 3% is an illustrative input, not a recommended rate. No inflation escalation is added because these are constant-dollar inputs. Residual value is a credit in the final year; recurring replacement and care still occur in that year if scheduled.

Scenario A

Your cost assumptions

One event per line: year, cost in today’s dollars, description. Additional events are added to annual care and replacement costs; avoid duplicates.

Scenario B

Your cost assumptions

One event per line: year, cost in today’s dollars, description. Additional events are added to annual care and replacement costs; avoid duplicates.

Hypothetical starter scenarios—not material prices, maintenance requirements, service-life predictions or quotes. Use equivalent scopes and actual supplier information. Annual care is charged in every future year, including the event year.

The same horizon. Two complete ledgers.

$16,066.53
A present value
$16,490
B present value
$423.47
PV difference

Undiscounted totals: A $16,800 · B $16,900. A has the lower present value under these inputs.

No cumulative cost ordering reversal occurs in this horizon.

Sensitivity check: if every cost and residual assumption for A varies together by ±20%, its PV spans $12,853.23 to $19,279.84; B spans $13,192 to $19,788. This is a proportional scenario range, not a probability or market forecast.

NowYear 10Scale ±$16,490Year 6 A: One-time repair / replacementYear 8 B: One-time repair / replacement
Solid burgundy: A. Dashed ochre: B. Cumulative present value includes the initial cost. The horizontal baseline is zero; terminal residual credits may reduce cumulative cost. Dots mark scheduled events and residual credits. The table supplies exact annual values and event descriptions.
YearA cashB cashA present valueB present valueA eventsB events
0$12,000$14,500$12,000$14,500Initial scopeInitial scope
1$300$150$291.26$145.63
2$300$150$282.78$141.39
3$300$150$274.54$137.27
4$300$150$266.55$133.27
5$300$150$258.78$129.39
6$2,100$150$1,758.72$125.62One-time repair / replacement
7$300$150$243.93$121.96
8$300$1,050$236.82$828.88One-time repair / replacement
9$300$150$229.93$114.96
10$300$150$223.23$111.61

Change one assumption at a time

These ranges vary just the named cost by ±20%, holding the horizon, rate and every other input fixed. They show model sensitivity, not confidence intervals.

Input variedA lower PVA upper PVB lower PVB upper PV
Initial scope$13,666.53$18,466.53$13,590$19,390
Annual care$15,554.72$16,578.34$16,234.09$16,745.9

Keep a private record

Sign in to save this snapshot across sessions. Each save creates a named project record; it does not submit an inquiry.

Review material inquiry

Method: PV = cost ÷ (1 + real rate)^year. At 0%, present value equals the cash total. Read the method and a worked example. Material labels do not alter costs. No material is assigned an automatic lifespan or maintenance schedule. Repair and replacement costs are additive; set either to zero when they represent the same work.